Custom Search


Copyright © 2014 J. Neely. All rights reserved.

banner_dailybiblestudy_org

To receive notice of each days Bible Study,
please go to my Twitter and Facebook pages and sign up.


Twitter -
Facebook -


Daily Bible Study
donation
You can help people worldwide. Please make a small donation.
Make a difference in someone elses life.
Subscribe
Daily Bible Study
Mailing List


Receive Daily Bible Studies directly into your email inbox.







Pools - Upper to Lower




The waters of the spring still flow through the tunnel that King Hezekiah dug (701 BC) through solid rock to bring the waters to the west side of the city. The Upper Pool was cut into the bedrock, more than a thousand years before by the Canaanites and was filled by the spring through a channel cut into the bedrock. Hezekiah originally designed his tunnel to begin at the rock cut pool (tunnel IV) and end at the Siloam Pool. (Pool to Pool), (Upper Pool to Lower Pool).



If You Wish To Support This Bible Study,
Please Make Your Donation Here




Return to Maps and Charts Table of Contents Page










Subscribe
Daily Bible Study
Mailing List


Receive Daily Bible Studies directly into your inbox.
Classifieds